This browser is too old to sign up, log in, or purchase. Please update to Safari 15.4 or later, or switch to the latest Chrome or Edge.
Pricing
HomeBlogChangelog
Pricing
新手起步插件激活插件更新
X (Twitter)YouTube
LogoFLO.W Obsidian Docs
HomeBlogChangelogPricing
Pricing
LogoFLO.W Obsidian

A complete Obsidian system for projects, tasks, notes, and reviews.

X (Twitter)YouTube
Resources
  • Blog
  • Docs
  • Obsidian Sync Guide
  • Pricing
About
  • About me
  • omasidian
  • Notion template
  • Notion course
Legal
  • Cookie Policy
  • Privacy Notice
  • Purchase Agreement
© 2026 FLO.W Obsidian. All Rights Reserved.

FLO.W 如何把任务转成项目

把已有任务转为项目,保留正文,再插入关联任务视图并拆出独立任务。

Last updated on

💡

These docs are still in draft. If anything is unclear, or you want to see other topics, post in the community group.

一开始,你可能觉得用一条任务就能承载这件事。执行时发现需要拆成多个步骤,还要分别安排时间,就可以把原来的任务转成项目,继续使用已有的文档。

以 准备周末聚餐.Task 为例,原本食材准备和下锅安排都写在同一篇文档里,现在需要把采购单独安排到前一天完成,就可以把聚餐任务转成项目,再建立独立的采购任务,把它与聚餐项目关联起来。

一、修改 FLO.W 类型

打开 准备周末聚餐.Task,将「FLO.W」笔记属性中原来的 Task 值改成 Project,确认后,这篇文档就会成为 准备周末聚餐.Project。它仍是原来的 Markdown 文档,正文和其他属性都会保留下来,无须另外新建一篇项目再搬运内容。

修改类型后,FLO.W Core 就会根据新的类型和当前状态自动调整文件位置。这篇文档的「Status」保持为 Doing,所以会从「任务」文件夹移动到「项目」文件夹。

二、补充视图

这篇文档最初按任务创建,原来的正文中没有「关联任务」数据库。修改「FLO.W」属性也不会自动套用项目模板,因此需要手动插入这个视图,用来集中查看后续拆出的任务。

先切换到编辑状态,把光标放在正文中希望插入的位置,再展开右侧栏,在 FLO.W 面板的「动作」中选择「当前页」,点击「任务 Base」按钮,就会在光标所在的位置插入「关联任务」数据库。

三、分拆任务

在项目的「关联任务」数据库中点击「新建」按钮,就可以创建一条任务,将它命名为「采购聚餐食材」。从这里创建的任务会自动填写「关联项目」属性,关联到当前的 准备周末聚餐.Project。

打开这条 采购聚餐食材.Task,就可以把需要购买的食材整理成正文清单,再通过「计划结束」属性安排采购时间。

如果相关任务此前已经单独建立,直接把它与当前项目关联即可,无须再建一份,操作见 FLO.W 如何创建关联。项目页面还可以怎样组织,见 FLO.W 的项目模块。

Still need help?
Ask in the community group.
Feishu community
Get FLO.W Obsidian
The complete vault plus the FLO.W Core plugin. One-time payment, no subscription, works offline, and your notes stay on your own computer.
See pricing
FLO.W 如何把任务转成项目
TREE
└一、修改 FLO.W 类型└二、补充视图└三、分拆任务
░░░░░░░░░░░░░░░░░░░░░░░░░░░░00%
PRESS ↑ / ↓ TO SCROLL
FOLLOW
BilibiliYouTubeX